Engines Jaguar: E-Type, XK120, XK140, XK150, MK2
Stage 1
Stage 1 in detail:
- Dip cleaning
- Pressure testing of the cylinder head and preparation for unleaded operation
- New valves, valve guides and springs incl. adjustment
- Replacement of valve seats / remilling
- Surface milling of valve cover
- Surface grinding of cylinder head
- Detailed documentation of all work steps taken as well as of all spare parts and/or wear and tear parts installed
Stage 2
Stage 2 in detail:
- Stage 1 plus:
- Immersion cleaning of engine block (special attention to water cooling channels); crack testing (pressure build up test) and painting
- Boring and honing of engine block
- New stud bolts
- Adjustment and fine balancing of crankshaft including flywheel as well as clutch plate and cover
- New oil pump
- Retrofitting to hydraulic chain tensioner
- New gaskets (incl. head gasket)
- Grinding and balancing of flywheel
- Grinding and fine balancing of camshafts (incl. documentation of valve timing, valve clearance and tick over)
- New main and con rod bearings
- Adjustment and fine balancing of connecting rods
- New timing chains
- New pistons, piston rings and gudgeon pins
- New bottom crankshaft seal
- New safety tab washers
- New heating and water hoses
- Replacement of frost plugs
- New water pump